Skip to product information
1 of 4

HEAVYEQUIPMENTPDF.COM

Komatsu PC8000 Hydraulic Mining Shovel General Assembly Procedure FAMPC8000-06

Komatsu PC8000 Hydraulic Mining Shovel General Assembly Procedure FAMPC8000-06

Regular price $40.00
Regular price Sale price $40.00
Sale Sold out
Quantity

Download Komatsu PC8000 Hydraulic Mining Shovel General Assembly Procedure FAMPC8000-06

Ensure safe and precise on-site erection with the official Komatsu PC8000 Hydraulic Mining Shovel General Assembly Procedure (Publication FAMPC8000-06). This technical field guide provides step-by-step installation instructions for heavy crawler frames, superstructure modules, twin power units, boom and bucket attachments, hydraulic lines, and electrical systems. Tailored for heavy equipment riggers, mining service engineers, and assembly crews, manual FAMPC8000-06 includes essential crane lifting diagrams, torque specifications, and commissioning checklists for ultraclass mining shovel deployment.

PUBLICATION NO : FAMPC8000-06
FILE SIZE : 5.19 MB
TOTAL PAGE : 158
LANGUAGE : ENGLISH

MODEL COVERED:-
PC8000 Hydraulic Mining Shovel

CONTENT INCLUDED:-
MOUNTING OF CRAWLER SEGMENTS TO THE SIDE FRAME
ASSEMBLY OF THE UNDERCARRIAGE
ASSEMBLY OF THE CABLE REEL UNIT
ASSEMBLY OF THE SUPERSTRUCTURE PLATFORM ONTO THE UNDERCARRIAGE
ASSEMBLY OF THE PRIME DRIVE UNIT TO THE SUPERSTRUCTURE PLATFORM
MOUNTING OF THE HYDRAULIC ACCESS LADDER
ASSEMBLY OF THE BOOM CYLINDERS AND THE STICK CYLINDER TO THE BOOM
ASSEMBLY OF THE BOOM
ASSEMBLY OF THE COUNTERWEIGHT
MOUNTING OF THE FUEL TANK OR MAIN SWITCH CABINET FOR ELECTRICAL DRIVEN UNIT
MOUNTING OF THE CAB BASE
MOUNTING OF THE CAB WITH SUPPORT FRAME
MOUNTING OF THE HIGH PRESSURE HOSES AND HYDRAULIC OIL TANK
MOUNTING OF THE HYDRAULIC OIL COOLER
MOUNTING OF THE HAND RAILS, CAT WALKS, STEPS AND THE GREASE BARREL CRANE
MOUNTING OF CABLE TRANSFER TO THE OPERATORS CAB
INSTALLATION OF HYDRAULIC HOSES TO THE ATTACHMENT AND ROTARY JOINT
CHECKING OF DIRECTION MOTOR ROTATION
CONNECTION OF ELECTRIC CABLES
FILLING THE HYDRAULIC SYSTEM
PRE-CHECKS PRIOR INITIAL START-UP
GENERAL
ONLY WITH ELECTRIC DRIVE
INITIAL START UP
ASSEMBLY OF THE STICK TO THE BOOM
MOUNTING OF THE STICK CYLINDERS TO THE STICK
ASSEMBLY OF THE BULLCLAM BUCKET TO THE STICK
MOUNTING OF THE PIN SEALS
PUTTING THE LUBRICATION SYSTEM INTO OPERATION
CHECKS AND ADJUSTMENTS PRIOR COMMISIONNING   

INSTANT DOWNLOAD ACCESS

View full details